Statewide Professional Coastal Engineering Services Awarded

- Posted in MRD News by
MRD Associates was selected under the RFSOQBDC02-15/16 for “Statewide Coastal Engineering Services”. The Department of Environmental Protection, Division of Recreation Services, Bureau of Design Read more

Construction Completed at Brooks Landing Waterfront Park.

- Posted in MRD News by
The Brooks Landing Waterfront Park Improvement project for the City of Fort Walton Beach has now been completed. Services provided included the design and construction of a pedestrian bridge, Read more

FEMA LOMR Successful for Client in South Walton County, FL.

- Posted in MRD News by
MRD Associates, Inc. recently completed permitting services with the Federal Emergency Management Agency (FEMA) for the revision of the local Flood Insurance Rate Map (FIRM) for a section of Read more

The Retreat Geotube and Dune Restoration Project Completed!

- Posted in MRD News by
Construction was recently completed on the 1,750 linear foot two-layer Geo-tube dune core, 20,000+ cubic yard dune restoration, 44,500 native dune plantings, and sand fencing project. The goal of Read more

Community Maritime Park Breakwaters and Mitigation Site Project Completed.

- Posted in MRD News by
The last of the 30,000 cubic yards of earthworks was graded, 21,500+ wetland plants installed, and 18,700 tons of Armor Stone placed to complete the mitigation project. The purpose of the project is Read more

MRD Conducts Tidal Study of East Pass for the City of Destin.

- Posted in MRD News by
MRD Associates conducted an investigation of East Pass to provide the City of Destin with spring tidal current data within the influence of the Pass. The study consisted of: 1) a vessel- mounted Read more

Panama City Airport Marina Permits Issued.

- Posted in MRD News by
MRD Associates developed a calibrated and verified regional hydrodynamic and water quality numerical model of the St. Andrews Bay system. This allows us to rapidly refine the model domain for new Read more